Difference between revisions of "Photon Beam"
From GlueXWiki
Line 42: | Line 42: | ||
* [[Microscope Readout Cable Lengths and Routes|microscope readout cable lengths and routes]] | * [[Microscope Readout Cable Lengths and Routes|microscope readout cable lengths and routes]] | ||
* [[Alignment and Calibration|alignment and calibration]] | * [[Alignment and Calibration|alignment and calibration]] | ||
+ | * [[Beam Commissioning Plan]] | ||
<br> | <br> | ||
* [[Tagger_and_Beamline_Working_Group_Archives|archived pages]] | * [[Tagger_and_Beamline_Working_Group_Archives|archived pages]] |
Revision as of 18:19, 7 November 2013
Design requirements |
Spectrometers |
Instrumentation |
Radiator System |
Photon beam pipe |
Collimation system |
Sweep Magnet 1 |
Shielding and radiation doses |
Sweep magnet 2 |
Beam simulations |
This is the central reporting page for the
GlueX Tagged Photon Beam Working Group
- group meetings
- send email to group list
- browse mailing list archives
- working group members (private)
- detector construction milestones (private)
- photon beam and tagger instrumentation paper (2010)
- Statement of Work for tagger procurement (2010)
- construction contracts and related info (private)
- discussion of e+/e- tertiary beams in Hall D
- Accelerator:
- Accelerator - Hall D Interface Document (draft - 2008)
- Accelerator Songsheets: links to the song sheets for the NE section of the machine including the beam line to Hall D tagger
- engineering drawings
- diamond radiator assessment
- microscope readout cable lengths and routes
- alignment and calibration
- Beam Commissioning Plan