Difference between revisions of "Dec 3, 2013 Calorimetry"
From GlueXWiki
(→Minutes) |
|||
Line 42: | Line 42: | ||
# Action Items | # Action Items | ||
# Monitoring | # Monitoring | ||
+ | #* Paper has been accepted. Already online. Final proofs in review | ||
# Discussion on raw data format for flash 250 MHz | # Discussion on raw data format for flash 250 MHz | ||
− | # | + | ## [[Level-1 Trigger#Manuals]] |
− | # | + | ## [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2274 GlueX-doc-2274] FADC125 Data Format |
− | # FCAL | + | ## Proposal to add tag=9 to Flash 250 MHz, which combines time and summed output, as proposed for the Flash125. |
+ | ##* Proposal accepted by group. Elton and David to meet with group at JLab to come up with definite proposal for feedback from this group | ||
+ | ##* Check dynamic range of proposed TDC time and summed signal | ||
+ | ##* Ideas for use of quality factor/pedestal bits: 10 bits for pedestal, 3 bits overflow, 2 bits quality factor. | ||
+ | # FCAL (John) | ||
+ | #* Complete dark box in about 1 week | ||
+ | #* Upstream cover ready to hang this afternoon or tomorrow | ||
+ | #* Downstream side: | ||
+ | #** patch panel completed | ||
+ | #** LED monitoring cables/system done (lacking 4 external cables) | ||
+ | #** External cables for power and control for bases installed | ||
+ | #** Complete enclosure by installing 3 pieces of Al, planned for the next few days | ||
+ | #** Still need to complete some re-programming of slow controls, planned for the next week | ||
+ | #** Fcal DAQ meetings have begun to organize the readout activities with Sasha and Marc. | ||
+ | #** Expect to turn on in about a week | ||
+ | #** (Elton) Need to check that fire protection for the dark room is on track to be installed and ready for turn on. | ||
+ | #** (Zisis) How was the monitoring system checked so far? (John) Temporary pulser system was used to check that appropriate LEDs light up when pulsed. | ||
# BCAL | # BCAL | ||
+ | ##* Cabling is complete (except for a small section left open for access to the interior of the solenoid) | ||
+ | ##* Cooling lines are all installed, but insulation is still needed | ||
+ | ##* Nitrogen system up to BCAL has been installed and pressure tested. Flow meters need to be added to connect BCAL to the system. | ||
+ | ##* Power is installed on the south racks, north will be added shortly. | ||
+ | ## BCAL cosmic rays (Shawn) | ||
+ | ##* Time-walk corrections are being finalized for the cosmic ray runs. Results will be shown next time. | ||
+ | ##* (Elton) What is the distribution of minimum-ionizing in the tested modules? Normalization compared reasonably week to expectation with a variation of about 15%. Angular corrections to the peaks will be done once the time-walk corrections are complete. | ||
+ | ##* Summary of tw corrections and normalization will be shown at the next meeting. | ||
+ | ## Single fiber single-photoelectron normalization (Andrei) | ||
+ | ##* Completed a reanalysis of the number of photoelectrons for fiber QA tests | ||
+ | ##* Latest analysis was more systematic than previous and is now completed. Need final iteration and an update to the documentation | ||
# Reconstruction and Simulation | # Reconstruction and Simulation | ||
+ | #* Giovanni has obtained his JLab account and is now starting to use the JLab cluster | ||
# TDR update | # TDR update | ||
+ | #* Elton: Hall D needs to comply with the JLab Configuration Management program. For this we will summarize each subsystem in description tables. The collection of summaries will be controlled by Eugene and a system owner. Changes need to be documented and signed. Elton has started on a draft using the BCAL and FCAL as examples and would like feedback from others in the group. Will distribute draft to John/Matt and Zisis for comments. | ||
# Calibration of Calorimeters | # Calibration of Calorimeters | ||
# Any other business | # Any other business |
Revision as of 18:33, 3 December 2013
Teleconference Time: 11:00 a.m. EST
- ESNET (Number is 8542553) and SeeVogh session (GlueX Calorimetry meeting room)
- Phone connection only upon request.
- +1-866-740-1260 : US+Canada
- +1-303-248-0285 : International
- then enter participant code: 3421244# (remember the "#").
- or www.readytalk.com (and code without the #)
Contents
Participant Direct Lines
- JLab Phone: in CC F326 is 757-269-6460 (usual room)
- JLab Phone in CC L207 is 757-269-7084
- Phone in the Regina Videoconference Suite is 306-585-4204
- Athens Phone: in Christina's office is 011-30-210-727-6947
Items for followup from previous meeting(s)
-
Revisit raw data format for Flash-250 MHz following Flash-125 MHz discussion. (Elton to send out info before next meeting)Links added to meeting agenda and discussed during meeting. - Provide short summary of constants and their use in determination of the sampling fraction (David)
Tentative Agenda
- Announcements
- Action Items
- Monitoring
- Discussion on raw data format for flash 250 MHz
- Level-1 Trigger#Manuals
- GlueX-doc-2274 FADC125 Data Format
- FCAL
- BCAL
- Reconstruction and Simulation
- TDR update
- Calibration of Calorimeters
- Any other business
Minutes
Attendees: Yi, Alam, Elton, John, David (JLab); Zisis, Shawn, Andrei (UofR)
- Announcements
- Action Items
- Monitoring
- Paper has been accepted. Already online. Final proofs in review
- Discussion on raw data format for flash 250 MHz
- Level-1 Trigger#Manuals
- GlueX-doc-2274 FADC125 Data Format
- Proposal to add tag=9 to Flash 250 MHz, which combines time and summed output, as proposed for the Flash125.
- Proposal accepted by group. Elton and David to meet with group at JLab to come up with definite proposal for feedback from this group
- Check dynamic range of proposed TDC time and summed signal
- Ideas for use of quality factor/pedestal bits: 10 bits for pedestal, 3 bits overflow, 2 bits quality factor.
- FCAL (John)
- Complete dark box in about 1 week
- Upstream cover ready to hang this afternoon or tomorrow
- Downstream side:
- patch panel completed
- LED monitoring cables/system done (lacking 4 external cables)
- External cables for power and control for bases installed
- Complete enclosure by installing 3 pieces of Al, planned for the next few days
- Still need to complete some re-programming of slow controls, planned for the next week
- Fcal DAQ meetings have begun to organize the readout activities with Sasha and Marc.
- Expect to turn on in about a week
- (Elton) Need to check that fire protection for the dark room is on track to be installed and ready for turn on.
- (Zisis) How was the monitoring system checked so far? (John) Temporary pulser system was used to check that appropriate LEDs light up when pulsed.
- BCAL
- Cabling is complete (except for a small section left open for access to the interior of the solenoid)
- Cooling lines are all installed, but insulation is still needed
- Nitrogen system up to BCAL has been installed and pressure tested. Flow meters need to be added to connect BCAL to the system.
- Power is installed on the south racks, north will be added shortly.
- BCAL cosmic rays (Shawn)
- Time-walk corrections are being finalized for the cosmic ray runs. Results will be shown next time.
- (Elton) What is the distribution of minimum-ionizing in the tested modules? Normalization compared reasonably week to expectation with a variation of about 15%. Angular corrections to the peaks will be done once the time-walk corrections are complete.
- Summary of tw corrections and normalization will be shown at the next meeting.
- Single fiber single-photoelectron normalization (Andrei)
- Completed a reanalysis of the number of photoelectrons for fiber QA tests
- Latest analysis was more systematic than previous and is now completed. Need final iteration and an update to the documentation
- Reconstruction and Simulation
- Giovanni has obtained his JLab account and is now starting to use the JLab cluster
- TDR update
- Elton: Hall D needs to comply with the JLab Configuration Management program. For this we will summarize each subsystem in description tables. The collection of summaries will be controlled by Eugene and a system owner. Changes need to be documented and signed. Elton has started on a draft using the BCAL and FCAL as examples and would like feedback from others in the group. Will distribute draft to John/Matt and Zisis for comments.
- Calibration of Calorimeters
- Any other business