Difference between revisions of "BCAL Commissioning"
From GlueXWiki
(→Upcoming Tasks) |
(→Upcoming Tasks) |
||
Line 7: | Line 7: | ||
## Check energy depositions in cells, starting with vertically oriented ones. | ## Check energy depositions in cells, starting with vertically oriented ones. | ||
## Check gains, including individual SiPMs into the sums. | ## Check gains, including individual SiPMs into the sums. | ||
− | # Develop scripts for analysis | + | # Develop scripts for analysis. |
== HOWTO Documentation == | == HOWTO Documentation == |
Revision as of 12:14, 28 May 2014
Upcoming Tasks
- Check hardware fixes with LED pulser data on the south as well as the north side.
- Keep monitoring pedestals, periodic fluctuations with temperatures in hall/crates.
- Check ADV values of trigger scintillators to ensure their HV is set correctly.
- Take more cosmics runs when everything is working.
- Check energy depositions in cells, starting with vertically oriented ones.
- Check gains, including individual SiPMs into the sums.
- Develop scripts for analysis.
HOWTO Documentation
- Coming soon