Line 4: Line 4:
 
# DAQ  (Beni)
 
# DAQ  (Beni)
 
# CDC status (Mike, Beni)
 
# CDC status (Mike, Beni)
#* noise studies [http://www.jlab.org/Hall-D/detector/CDC/HVC6onOnly_nogrounding.png no ground],[http://www.jlab.org/Hall-D/detector/CDC/HVC6onOnly_nogrounding.png with ground]  
+
#* noise studies [http://www.jlab.org/Hall-D/detector/fdc/CDC/HVC6onOnly_nogrounding.png no ground],[http://www.jlab.org/Hall-D/detector/fdc/CDC/HVC6onOnly_nogrounding.png with ground]  
 
# FDC status (Lubomir)
 
# FDC status (Lubomir)
 
# Electronics (Chris, Nick)
 
# Electronics (Chris, Nick)

Revision as of 16:21, 14 August 2014

August 14, 2014 FDC+CDC meeting

Agenda

  1. DAQ (Beni)
  2. CDC status (Mike, Beni)
  3. FDC status (Lubomir)
  4. Electronics (Chris, Nick)
  5. Engineering (Bill)
    • Chiller
    • Cathode scan [1] (Luke)
  6. Commissioning Wiki Page, FDC commissioning plan (all)
  7. Other

Instructions for Bluejeans meeting connection

FDC meeting ID: 290664653

Minutes

Participants: Curtis, Naomi(CMU), Sean (NU), Bill, Luke, Mike, Chris, Simon, Beni, Fernando and Lubomir (JLab).


CDC update

- Beni installed a wide grounding braid connecting in a chain all HV boards in one sector (#4)