Difference between revisions of "Run Coordination Meetings: Fall 2014"
From GlueXWiki
(→Meeting General Agenda) |
(→Meeting General Agenda) |
||
Line 19: | Line 19: | ||
# [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&systemId=®ionId=29&groupId= Hot Check OUT Status] | # [https://accweb.acc.jlab.org/hco/reports/overall-status?destinationId=9&systemId=®ionId=29&groupId= Hot Check OUT Status] | ||
# Installation punch list (items in<span style="color:red"> red: must by Sept 22nd </span>; Blue: <span style="color:blue"> Done by 2nd Fall run</span>; <span style="color:green"> Green: Nice to have it</span> | # Installation punch list (items in<span style="color:red"> red: must by Sept 22nd </span>; Blue: <span style="color:blue"> Done by 2nd Fall run</span>; <span style="color:green"> Green: Nice to have it</span> | ||
+ | *Target/Start Counter | ||
+ | # Specific safety notice (from Tom/Tim/Mark) | ||
<span style="color:red"> Pair converter operational</span> | <span style="color:red"> Pair converter operational</span> | ||
<span style="color:red"> Pair spectrometer detector surveyed</span> | <span style="color:red"> Pair spectrometer detector surveyed</span> | ||
<span style="color:red"> Profile monitors</span> | <span style="color:red"> Profile monitors</span> | ||
<span style="color:red"> Active collimator</span> | <span style="color:red"> Active collimator</span> | ||
− |
Revision as of 14:59, 12 September 2014
Connect Information
To connect from the outside by phone please do the following
1.) To join via a Web Browser, go to the page [1] https://bluejeans.com/660743227.
2.) To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 660743227.
3.) To join via phone, use one of the following numbers and the Conference ID: 660743227.
Dial Either +1 408 740 7256 or +1 888 240 2560 for US or Canada
4.) More information on connecting to bluejeans is available. The old ESNET and SeeVough Information is archived here.
Meeting General Agenda
- Report relevant updates from 7:50 and 8:00 daily MCC meetings
- Report on yesterday Hall D related events
- Hot Check OUT Status
- Installation punch list (items in red: must by Sept 22nd ; Blue: Done by 2nd Fall run; Green: Nice to have it
*Target/Start Counter
- Specific safety notice (from Tom/Tim/Mark)
Pair converter operational Pair spectrometer detector surveyed Profile monitors Active collimator