Difference between revisions of "BLTWG Meeting 09/15/2014"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 18: | Line 18: | ||
# Report on tagger hodoscope setup and tests in Tagger Hall - ''Franz K.'' | # Report on tagger hodoscope setup and tests in Tagger Hall - ''Franz K.'' | ||
# Report on tagger microscope setup and tests in ESB - ''James M, Alex B.'' | # Report on tagger microscope setup and tests in ESB - ''James M, Alex B.'' | ||
− | #* Tagger microscope | + | #* [http://zeus.phys.uconn.edu/halld/tagger/fp-microscope/fiberQA-2-2014/Travelers.pdf Tagger microscope construction summary document] |
# Report on active collimator setup and tests - ''Alex B.'' | # Report on active collimator setup and tests - ''Alex B.'' | ||
# Report on pair spectrometer setup and tests - ''Alex S.'' | # Report on pair spectrometer setup and tests - ''Alex S.'' |
Revision as of 11:17, 15 September 2014
Organization
- Time: 11:30 EST, pre-meeting at 11:00 EST
- Connecting: detailed instructions are here
- H.323 ip address: 199.48.152.152
- web browser: https://bluejeans.com/536076821
- phone: 408-740-7256 or 888-240-2560
- Conference id: 536076821
- Present:
Agenda
- Announcements
- Collaboration Meeting
- Accelerator-Hall D Interface Control Document, draft 14 - Elton S.
- Photon beam commissioning plan review - Richard J.
- Tagger hall simulations - Richard J.
- Tagger hall configuration during initial beam tune - discussion
- Report on tagger hodoscope setup and tests in Tagger Hall - Franz K.
- Report on tagger microscope setup and tests in ESB - James M, Alex B.
- Report on active collimator setup and tests - Alex B.
- Report on pair spectrometer setup and tests - Alex S.
- Pair spectrometer field stability study - Alexandre D.
- Report on diamond milling and mount construction - Brendan P
- Report on polarimeter construction - Michael D