Difference between revisions of "April 4, 2015"
From GlueXWiki
Line 19: | Line 19: | ||
:: -[[Media:fcal_cosmic2.pdf | FCAL cosmic]] | :: -[[Media:fcal_cosmic2.pdf | FCAL cosmic]] | ||
:: -[[Media:bcal_cosmic.pdf | BCAL cosmic]] | :: -[[Media:bcal_cosmic.pdf | BCAL cosmic]] | ||
− | |||
*Trigger Monitoring | *Trigger Monitoring |
Revision as of 09:52, 6 April 2015
Trigger Commissioning plan
- PS trigger with tagger (1 shift)
- Tune trigger parameters (timing offsets), prepare DAQ trigger configuration (no steady beam required)
- (take calibration data with PS/tagger crates, 6 hours of steady beam)
- FCAL and BCAL triggers (3 shifts)
- Perform threshold scans, tune timing offsets (steady beam required)
- Tune parameters for the FCAL & BCAL trigger
- Commission ST/TOF triggers (1 shift)
- Commission coincidence triggers for BCAL/FCAL and ST/TOF (2 shift)
- - Trigger for FDC alignment
- - Study FCAL coincidence with ST
- Commission multiple triggers (3 shifts)
- Tune trigger delays and prescaling factors (steady beam required)
- Integrate PS, prepare trigger configuration files
FCAL/BCAL cosmic
- Trigger Monitoring
- Trigger for Polarimeter