(Created page with "==Monday, March 28== # Accelerator Status ## started beam delivery Sunday ## today: Hall B 1-pass extraction work will interrupt beam availability ## Hall A Moller quads need...") |
|||
Line 1: | Line 1: | ||
+ | ==Tuesday, March 29== | ||
+ | |||
+ | # Accelerator Status | ||
+ | ## Problem with RF 2L07-7 overnight, control module replaced | ||
+ | ## today after lunch: spin studies, will have few interruptions of 15 min. each | ||
+ | ## beam studies scheduled for Thursday | ||
+ | # Hall-D/GlueX items | ||
+ | ## beam issues | ||
+ | ##* drifting y-position | ||
+ | ##* satelite bump in beam profiler still there, plus new wart on main peak of x | ||
+ | ##* active target counting rate low | ||
+ | ## [[media:Quadrupolestudy-3-25-2016.pdf|quadrupole commissioning study]] | ||
+ | ## FCAL field dependence study data being taken yesterday (Adesh) | ||
+ | ## pair spectrometer study while ramping: deferred | ||
+ | ## other systems? | ||
+ | # Run Plan | ||
+ | #* 10:00 study photon beam intensity as function of locks, polarization | ||
+ | #* 12:00 trigger studies | ||
+ | #* 16:00 production running | ||
+ | # Offline analysis? | ||
+ | # Administrative Items | ||
+ | ## Standard Conditions | ||
+ | ## Google Calendar | ||
+ | # AOB? | ||
+ | |||
==Monday, March 28== | ==Monday, March 28== | ||
Revision as of 08:30, 29 March 2016
Tuesday, March 29
- Accelerator Status
- Problem with RF 2L07-7 overnight, control module replaced
- today after lunch: spin studies, will have few interruptions of 15 min. each
- beam studies scheduled for Thursday
- Hall-D/GlueX items
- beam issues
- drifting y-position
- satelite bump in beam profiler still there, plus new wart on main peak of x
- active target counting rate low
- quadrupole commissioning study
- FCAL field dependence study data being taken yesterday (Adesh)
- pair spectrometer study while ramping: deferred
- other systems?
- beam issues
- Run Plan
- 10:00 study photon beam intensity as function of locks, polarization
- 12:00 trigger studies
- 16:00 production running
- Offline analysis?
- Administrative Items
- Standard Conditions
- Google Calendar
- AOB?
Monday, March 28
- Accelerator Status
- started beam delivery Sunday
- today: Hall B 1-pass extraction work will interrupt beam availability
- Hall A Moller quads need work, target filling, some viewer broken
- Hall D can ask for beam (beam on now), but may be taken away for extraction work
- Hall-D/GlueX items
- beam issues
- drifting y-position
- left should in y in tagger harp scan
- satelite bump in beam profiler still there, plus new wart on main peak of x
- active target counting rate low
- magnet ramping now...done by 2 pm
- Lubomir proposal, executed overnight last night
- quadrupole commissioning study
- FCAL field dependence study data being taken now (Adesh)
- pair spectrometer study while ramping?
- other systems?
- beam issues
- Run Plan
- Offline analysis?
- Next meeting?
- AOB?