Difference between revisions of "Run Planning Meeting Notes, March 27-April 2, 2016"
From GlueXWiki
(→Tuesday, March 29) |
(→Tuesday, March 29) |
||
Line 12: | Line 12: | ||
## FCAL field dependence study data being taken yesterday (Adesh) | ## FCAL field dependence study data being taken yesterday (Adesh) | ||
## pair spectrometer study while ramping: deferred | ## pair spectrometer study while ramping: deferred | ||
+ | ## gluonraid space | ||
## other systems? | ## other systems? | ||
# Run Plan | # Run Plan |
Revision as of 08:45, 29 March 2016
Tuesday, March 29
- Accelerator Status
- Problem with RF 2L07-7 overnight, control module replaced
- today after lunch: spin studies, will have few interruptions of 15 min. each
- beam studies scheduled for Thursday
- Hall-D/GlueX items
- beam issues
- drifting y-position
- satelite bump in beam profiler still there, plus new wart on main peak of x
- active target counting rate low
- FCAL field dependence study data being taken yesterday (Adesh)
- pair spectrometer study while ramping: deferred
- gluonraid space
- other systems?
- beam issues
- Run Plan
- Tuesday
- 10:00 study photon beam intensity as function of locks, polarization
- 12:00 trigger studies
- 16:00 transmission studies
- 17:00 production running
- Wednesday
- 00:00 quadrupole commissioning study
- 06:00 production running
- Tuesday
- Offline analysis?
- Administrative Items
- Standard Conditions
- Google Calendar
- AOB?
Monday, March 28
- Accelerator Status
- started beam delivery Sunday
- today: Hall B 1-pass extraction work will interrupt beam availability
- Hall A Moller quads need work, target filling, some viewer broken
- Hall D can ask for beam (beam on now), but may be taken away for extraction work
- Hall-D/GlueX items
- beam issues
- drifting y-position
- left should in y in tagger harp scan
- satelite bump in beam profiler still there, plus new wart on main peak of x
- active target counting rate low
- magnet ramping now...done by 2 pm
- Lubomir proposal, executed overnight last night
- quadrupole commissioning study
- FCAL field dependence study data being taken now (Adesh)
- pair spectrometer study while ramping?
- other systems?
- beam issues
- Run Plan
- Offline analysis?
- Next meeting?
- AOB?
Sunday, March 27
No meeting.