Difference between revisions of "Run Planning Meeting Notes, April 11-April 18, 2016"
From GlueXWiki
Line 2: | Line 2: | ||
* [http://calendar.google.com Google Calendar] | * [http://calendar.google.com Google Calendar] | ||
+ | ==Tuesday, April 12== | ||
+ | |||
+ | # Accelerator Status | ||
+ | #* Beam went down at 7am for work in SL. | ||
+ | #* Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass. | ||
+ | #* Beam expected back sometime during swing shift | ||
+ | # Hall-D/GlueX items | ||
+ | #* [https://logbooks.jlab.org/entry/3397757 Solenoid Incident] | ||
+ | #* https://logbooks.jlab.org/entry/3397771 | ||
+ | #* Latest scans: [https://logbooks.jlab.org/entry/3397829 5C11,5C11B] , [https://logbooks.jlab.org/entry/3397842 Hall-D harp scan] | ||
+ | #* other systems? | ||
+ | # Run Plan | ||
+ | #* Mode 8 run w/ Amorphous '''~1hr''' | ||
+ | #* TRD runs '''~1hr''' (Lubomir, Sergey) | ||
+ | #* Halo Linearity scan (Hovanes) | ||
+ | #* Harp scan collection | ||
+ | #* [https://docs.google.com/spreadsheets/d/1NffTc4-S5PbTMSuH_pp7ZYsGRH4JC_WSVo770_iJYt0/edit?usp=sharing Production running] | ||
+ | #** [https://logbooks.jlab.org/entry/3393844 Parasitic quadrupole test] | ||
+ | #** Parasitic DAQ livetime/RAID test | ||
+ | # Offline analysis? | ||
+ | # AOB? | ||
==Monday, April 11== | ==Monday, April 11== | ||
Revision as of 07:59, 12 April 2016
Tuesday, April 12
- Accelerator Status
- Beam went down at 7am for work in SL.
- Accelerator will investigate going back to 5th pass separation. If possible, Hall-A will use 5 pass beam. If not, they will use 4 pass.
- Beam expected back sometime during swing shift
- Hall-D/GlueX items
- Solenoid Incident
- https://logbooks.jlab.org/entry/3397771
- Latest scans: 5C11,5C11B , Hall-D harp scan
- other systems?
- Run Plan
- Mode 8 run w/ Amorphous ~1hr
- TRD runs ~1hr (Lubomir, Sergey)
- Halo Linearity scan (Hovanes)
- Harp scan collection
- Production running
- Parasitic quadrupole test
- Parasitic DAQ livetime/RAID test
- Offline analysis?
- AOB?
Monday, April 11
- Accelerator Status
- Beam went down at 7am for radcon survey of SL
- Hall-A going to 2 pass (will take a couple of hours. Estimate is to come back ~10am)
- "... blind ..."
- Hall-D/GlueX items
- Solenoid Trip
- Latest scans: 5C11,5C11B , Hall-D harp scan
- Beam current Stability
- Rates and Live times
- other systems?
- Run Plan
- Mode 8 run w/ Amorphous ~1hr
- TRD runs ~1hr (Lubomir, Sergey)
- Halo Linearity scan (Hovanes)
- Harp scan collection
- Production running
- Parasitic quadrupole test
- Parasitic DAQ livetime/RAID test
- Offline analysis?
- AOB?