Difference between revisions of "April 22, 2016 PID Upgrade"
From GlueXWiki
Line 19: | Line 19: | ||
# Announcements | # Announcements | ||
# Optical box design update (MIT): | # Optical box design update (MIT): | ||
− | # [[https://gluexdirc.mit.edu/superposition-3-fibers-sig-15-inc-6#overlay-context=superposition-3-fibers-sig-10-inc-5| | + | # [[https://gluexdirc.mit.edu/superposition-3-fibers-sig-15-inc-6#overlay-context=superposition-3-fibers-sig-10-inc-5 | Calibration]] |
# Bar box shipping (John and Matt) | # Bar box shipping (John and Matt) | ||
# Support structure design update (IU) | # Support structure design update (IU) | ||
# [[DIRC Planning for FY16|Planning for FY16]] | # [[DIRC Planning for FY16|Planning for FY16]] | ||
# AOB | # AOB |
Revision as of 14:27, 21 April 2016
Meeting Information
GlueX PID Upgrade Meeting
Friday, April 22, 2016
11 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Optical box design update (MIT):
- [| Calibration]
- Bar box shipping (John and Matt)
- Support structure design update (IU)
- Planning for FY16
- AOB