Difference between revisions of "May 6, 2016 PID Upgrade"
From GlueXWiki
(→Agenda) |
|||
Line 21: | Line 21: | ||
# Optical box design update (MIT): | # Optical box design update (MIT): | ||
#* Laser access port design (Avetik/Maria) | #* Laser access port design (Avetik/Maria) | ||
+ | #* Photon loss due to the gap for the fiber [[https://gluexdirc.mit.edu/mirror-gap|mirror gap]] | ||
# [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2996 Bar box shipping document] (John and Matt) | # [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2996 Bar box shipping document] (John and Matt) | ||
# Support structure design update (IU) | # Support structure design update (IU) | ||
# [[DIRC Planning for FY16|Planning for FY16]] | # [[DIRC Planning for FY16|Planning for FY16]] | ||
# AOB | # AOB |
Revision as of 13:54, 5 May 2016
Meeting Information
GlueX PID Upgrade Meeting
Friday, May 6, 2016
11 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Collaboration Meeting
- Optical box design update (MIT):
- Laser access port design (Avetik/Maria)
- Photon loss due to the gap for the fiber [gap]
- Bar box shipping document (John and Matt)
- Support structure design update (IU)
- Planning for FY16
- AOB