Difference between revisions of "December 7th, 2016"
(Created page with "The tentative agenda: 1) Our schedule for the proposal (back in time): - We may expect that PAC will be scheduled for July. - We have to submit our proposal 6 weeks in adva...") |
|||
Line 26: | Line 26: | ||
-- ds/dO for xxx ? | -- ds/dO for xxx ? | ||
− | 5) | + | 5) Calculate the spectrum (p,theta) of the K0 and n coming from the Be target. |
− | 6) | + | 6) Status of neutron background simulations (Igor) [[https://halldweb.jlab.org/wiki/images/6/68/KL.pdf]] |
− | 7) | + | 7) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable. |
8) Schedule for the next meeting. | 8) Schedule for the next meeting. | ||
9) etc. | 9) etc. |
Revision as of 01:48, 7 December 2016
The tentative agenda:
1) Our schedule for the proposal (back in time):
- We may expect that PAC will be scheduled for July.
- We have to submit our proposal 6 weeks in advance (May-June).
- It will probably take 4 weeks for the GlueX Collaboration to review (April-May).
- In March, we plan to ask Rolf for a technical review (Jim Napolitano's suggestion).
- GlueX Collab meeting is scheduled for Feb 16-18 and we have to talk about KL.
2) We have to make a conceptual design of the KL project which allows to estimate a cost of the KL (Jim Napolitano's suggestion). To do that we have to draw a Note and then ask Eugene to ask Tim to make it.
3) Put the right LH2 target and beamline into GlueX MC.
4) Simulate a few K0-induced reactions in the LH2 target and evaluate the acceptance, resolutions, background etc. Simulate the interactions of the K0 and n in the material of the GlueX setup.
-- ds/dO for KLp-->K+n (Mikhail).
-- ds/dO and Sigma for KLp-->K+Xi (Nick).
-- ds/dO for xxx ?
5) Calculate the spectrum (p,theta) of the K0 and n coming from the Be target.
6) Status of neutron background simulations (Igor) [[1]]
7) Simulate the n-interaction in the LH2 target with the neutron flux will be reasonable.
8) Schedule for the next meeting.
9) etc.