Difference between revisions of "July 15, 2016 DIRC Engineering"
From GlueXWiki
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
|||
Line 22: | Line 22: | ||
#* Review action items from previous meetings | #* Review action items from previous meetings | ||
#* Support requirements for optical boxes | #* Support requirements for optical boxes | ||
− | #* Statement of Work to procurement after signatures [ | + | #* Statement of Work to procurement after signatures [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3081 DocDB] |
# Optical box design | # Optical box design | ||
#* Agreement from Rolf and Patrizia to start full contract for both optical boxes in FY16 | #* Agreement from Rolf and Patrizia to start full contract for both optical boxes in FY16 | ||
# Installation plan [[File:DIRC Installation Steps in Hall D.docx|draft]] | # Installation plan [[File:DIRC Installation Steps in Hall D.docx|draft]] | ||
# AOB | # AOB |
Latest revision as of 17:10, 24 February 2017
Meeting Information
GlueX DIRC Engineering Meeting
Friday, July 15, 2016
11 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Support structure
- Optical box design
- Agreement from Rolf and Patrizia to start full contract for both optical boxes in FY16
- Installation plan File:DIRC Installation Steps in Hall D.docx
- AOB