Difference between revisions of "BLTWG Meeting 5/15/2008"
From GlueXWiki
(→Notes by R. Jones) |
(→Pair Spectrometer Specs) |
||
Line 9: | Line 9: | ||
===Notes by R. Jones=== | ===Notes by R. Jones=== | ||
----- | ----- | ||
− | ====Pair Spectrometer | + | ====Pair Spectrometer Specification==== |
+ | The discussion centered around the main tasks that the Hall D pair spectrometer must be designed to perform. | ||
+ | # '''monitoring the photon beam spectrum''' This is needed for polarized beam running in order to be able to continuously monitor the polarization of the beam. | ||
+ | |||
====Action Items==== | ====Action Items==== |
Revision as of 12:38, 15 May 2008
- Time: 10:00 EST
- Place: EVO and ESNET
- Present: Jim Whitlatch, Tim Stewart, Richard Jones, Franz Klein, Dan Sober, Elke Aschenaur, Eugene Chudakov
Agenda
- Discussion of the pair spectrometer specifications
- Items required for the Lehmann Review
Notes by R. Jones
Pair Spectrometer Specification
The discussion centered around the main tasks that the Hall D pair spectrometer must be designed to perform.
- monitoring the photon beam spectrum This is needed for polarized beam running in order to be able to continuously monitor the polarization of the beam.