Difference between revisions of "January 25, 2018 DIRC"
From GlueXWiki
(→Agenda) |
|||
Line 21: | Line 21: | ||
# Bar box transportation | # Bar box transportation | ||
#* Planning for final 3 bar boxes | #* Planning for final 3 bar boxes | ||
− | #** | + | #** Crate shipment to IU and construction plans |
#** Dates to discuss with SLAC | #** Dates to discuss with SLAC | ||
# Optical box | # Optical box | ||
+ | #* Plan for engineering meetings (alternate Thursdays with this meeting) | ||
#* Status update (Ernie and Jason) | #* Status update (Ernie and Jason) | ||
− | #** Box production at Lesker: final production drawings | + | #** Box production at Lesker: final production drawings (?) |
#** PMT test fixture | #** PMT test fixture | ||
#** Other items and quotes | #** Other items and quotes | ||
#** Followup on questions to drawing package(?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file] | #** Followup on questions to drawing package(?): [https://www.dropbox.com/s/rvsubsp62145w6x/GLUEX%20FOB%20MK2%20BOX%20WELDMENT%20LH.STEP?dl=0 STEP file] | ||
− | # | + | # Simulation studies (Maria and Roman) |
# MAPMT testing (Bill) | # MAPMT testing (Bill) | ||
# AOB | # AOB |
Revision as of 09:23, 25 January 2018
Meeting Information
GlueX DIRC Meeting
Thursday January 25, 2018
1:00 pm, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Support structure update (John, Tim, Tom)
- Roll fixture testing
- Bar box transportation
- Planning for final 3 bar boxes
- Crate shipment to IU and construction plans
- Dates to discuss with SLAC
- Planning for final 3 bar boxes
- Optical box
- Plan for engineering meetings (alternate Thursdays with this meeting)
- Status update (Ernie and Jason)
- Box production at Lesker: final production drawings (?)
- PMT test fixture
- Other items and quotes
- Followup on questions to drawing package(?): STEP file
- Simulation studies (Maria and Roman)
- MAPMT testing (Bill)
- AOB