Difference between revisions of "February 1, 2018 DIRC Optical Box"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meeting Information == GlueX DIRC Optical Box Meeting<br> Thursday February 1, 2018<br> 10:00 am, EDT<br> Hall D Counting House <br> == Connection Using Bluejeans == # To...")
 
(Agenda)
Line 16: Line 16:
 
== Agenda ==
 
== Agenda ==
  
# Announcements
 
#* [https://halldweb.jlab.org/wiki/index.php/GlueX-Collaboration-Feb-2018 Collaboration meeting]
 
# Support structure update (John, Tim, Tom)
 
#* Roll fixture testing
 
# Bar box transportation
 
#* Crate shipment to IU and construction plans
 
#* Dates to discuss with SLAC
 
 
# Optical box
 
# Optical box
#* Plan for engineering meetings (Bates+JLab: alternate Thursdays with this meeting)
 
 
#* Status update (Ernie and Jason)
 
#* Status update (Ernie and Jason)
 
#** Box production at Lesker: final production drawings (?)
 
#** Box production at Lesker: final production drawings (?)

Revision as of 08:17, 1 February 2018

Meeting Information

GlueX DIRC Optical Box Meeting
Thursday February 1, 2018
10:00 am, EDT
Hall D Counting House

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Optical box
    • Status update (Ernie and Jason)
      • Box production at Lesker: final production drawings (?)
      • PMT test fixture
      • Other items and quotes
      • Followup on questions to drawing package (postpone to engineering meetings?): STEP file