Line 5: | Line 5: | ||
* [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar] | * [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar] | ||
+ | == Friday, February 16 == | ||
+ | # Notes from the previous 24 hours: | ||
+ | #* Accelerator was down starting around 9am until ... | ||
+ | #* Controlled Access | ||
+ | #** [https://logbooks.jlab.org/entry/3532443 Colin replaced FCAL bases] | ||
+ | #** The muon chamber steel plate was moved behind the detector | ||
+ | #** [https://logbooks.jlab.org/entry/3532483 Alex B. went in to adjust active collimator baselines for multiple gain settings] | ||
+ | #* Active collimator scans ? | ||
+ | #* Sasha trigger study ? | ||
+ | #* Production data overnight ? | ||
+ | # Issues: | ||
+ | # Reports (?): | ||
+ | # Today's run plan [https://calendar.google.com/calendar/embed?src=halldops%40gmail.com&src=503o985nbesua43smquc510o8k%40group.calendar.google.com&ctz=America/New_York Google Calendar]: | ||
+ | #* Harp scan at 7am | ||
+ | #** Empty target while taking harp scans | ||
+ | #* Empty target run (1 hr) | ||
+ | #* Raw mode while filling target | ||
+ | #* Very low / very very low intensity run | ||
Revision as of 15:39, 15 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, February 16
- Notes from the previous 24 hours:
- Accelerator was down starting around 9am until ...
- Controlled Access
- Colin replaced FCAL bases
- The muon chamber steel plate was moved behind the detector
- Alex B. went in to adjust active collimator baselines for multiple gain settings
- Active collimator scans ?
- Sasha trigger study ?
- Production data overnight ?
- Issues:
- Reports (?):
- Today's run plan Google Calendar:
- Harp scan at 7am
- Empty target while taking harp scans
- Empty target run (1 hr)
- Raw mode while filling target
- Very low / very very low intensity run
- Harp scan at 7am
Thursday, February 15
- Notes from the previous 24 hours:
- Controlled Access
- Hovanes put lead on the beam profiler for the v-wire study
- Colin and Matt replaced FCAL bases
- Lubomir went in for the FDC
- (in the evening) Alex B. went in to swap voltage adapters for the active collimator
- Hovanes made a V-wire study
- Todd tried to improve beam optics but resulted in no change Rates
- Sergey and the DAQ group high intensity studies
- AC scan moved to later time with stable beam
- Intensity scan statistics
- Controlled Access
- Issues:
- Reports (?):
- Today's run plan Google Calendar:
- Accelerator down 4hr for "restoring corners" starting around 9am.
- Hall B Mott will be invasive, likely a couple hours without beam
- Controlled access during accelerator downtime
- Muon chamber work
- FCAL?
- Anyone else?
- Harp scan once beam returns
- AC scans
- Sasha trigger study