Difference between revisions of "Run Planning Meeting Notes, Feb 15-Feb 21, 2018"
From GlueXWiki
(→Friday, February 16) |
|||
Line 7: | Line 7: | ||
== Friday, February 16 == | == Friday, February 16 == | ||
# Notes from the previous 24 hours: | # Notes from the previous 24 hours: | ||
− | #* Accelerator was down | + | #* Accelerator was down to restore the corners to values from a month ago |
#* Controlled Access | #* Controlled Access | ||
#** [https://logbooks.jlab.org/entry/3532443 Colin replaced FCAL bases] | #** [https://logbooks.jlab.org/entry/3532443 Colin replaced FCAL bases] | ||
Line 23: | Line 23: | ||
#* Raw mode while filling target | #* Raw mode while filling target | ||
#* Very low / very very low intensity run | #* Very low / very very low intensity run | ||
− | |||
== Thursday, February 15 == | == Thursday, February 15 == |
Revision as of 15:40, 15 February 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, February 16
- Notes from the previous 24 hours:
- Accelerator was down to restore the corners to values from a month ago
- Controlled Access
- Colin replaced FCAL bases
- The muon chamber steel plate was moved behind the detector
- Alex B. went in to adjust active collimator baselines for multiple gain settings
- Active collimator scans ?
- Sasha trigger study ?
- Production data overnight ?
- Issues:
- Reports (?):
- Today's run plan Google Calendar:
- Harp scan at 7am
- Empty target while taking harp scans
- Empty target run (1 hr)
- Raw mode while filling target
- Very low / very very low intensity run
- Harp scan at 7am
Thursday, February 15
- Notes from the previous 24 hours:
- Controlled Access
- Hovanes put lead on the beam profiler for the v-wire study
- Colin and Matt replaced FCAL bases
- Lubomir went in for the FDC
- (in the evening) Alex B. went in to swap voltage adapters for the active collimator
- Hovanes made a V-wire study
- Todd tried to improve beam optics but resulted in no change Rates
- Sergey and the DAQ group high intensity studies
- AC scan moved to later time with stable beam
- Intensity scan statistics
- Controlled Access
- Issues:
- Reports (?):
- Today's run plan Google Calendar:
- Accelerator down 4hr for "restoring corners" starting around 9am.
- Hall B Mott will be invasive, likely a couple hours without beam
- Controlled access during accelerator downtime
- Muon chamber work
- FCAL?
- Anyone else?
- Harp scan once beam returns
- AC scans
- Sasha trigger study