Difference between revisions of "Run Planning Meeting Notes, Apr12-Apr 18, 2018"
From GlueXWiki
(→Thursday, April 12 at 08:45) |
(→Thursday, April 12 at 08:45) |
||
Line 21: | Line 21: | ||
#* Pass change this morning | #* Pass change this morning | ||
#** Short access to install copper and tungsten shields | #** Short access to install copper and tungsten shields | ||
− | #* Production | + | #* Production running |
#* Fast raster scan postponed to Monday | #* Fast raster scan postponed to Monday | ||
# AOB | # AOB |
Revision as of 05:12, 12 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Thursday, April 12 at 08:45
- Notes from the previous 24 hours:
- TAC run (evening strip chart) was finished around 10pm. Took data with both the 750um and 75um converter.
- Production started around 11 pm and has continued through the night.
- Issues:
- When adjusting a procedure, please contact the expert before doing so to make sure the changes you make are okay.
- ~1hr 20 mins of DAQ issues while the target was filling and we could not run in raw mode.
- Reports:
- Correlation between beam Y position and CDC HV current (Beni)
- Attenuation lengths (Lubomir)
- PS acceptance from TAC run with 1/3 of data (Sasha)
- [Low Level Monitoring Report]
- Run Plan
- Pass change this morning
- Short access to install copper and tungsten shields
- Production running
- Fast raster scan postponed to Monday
- Pass change this morning
- AOB
Friday, April 13 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- AOB