Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"
From GlueXWiki
m |
m |
||
Line 18: | Line 18: | ||
#*Friday | #*Friday | ||
#**High rate DAQ tests (9.30 am) | #**High rate DAQ tests (9.30 am) | ||
+ | #**Injector recovery (MCC, possible beam down ~1hr) | ||
#**TAC Run (2 pm) | #**TAC Run (2 pm) | ||
#*Saturday | #*Saturday |
Revision as of 08:16, 27 April 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- Injector recovery (MCC, possible beam down ~1hr)
- TAC Run (2 pm)
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan/Other items
- Resumption of raster scan studies
- Level 1 trigger studies
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [8]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB