Difference between revisions of "Run Planning Meeting Notes, Apr 26-May 2, 2018"
From GlueXWiki
m |
|||
Line 16: | Line 16: | ||
# Issues: | # Issues: | ||
#* High-Level Monitoring [https://logbooks.jlab.org/entry/3569757] | #* High-Level Monitoring [https://logbooks.jlab.org/entry/3569757] | ||
+ | #* Occupancies in tagger monitoring [https://logbooks.jlab.org/entry/3570058] | ||
# Reports: | # Reports: | ||
# Run Plan | # Run Plan |
Revision as of 08:33, 1 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Tuesday, May 1 at 08:45
- Notes from previous 24 hours:
- Issues:
- Reports:
- Run Plan
- Tuesday
- Production Running
- Raster Scan Studies
- Wednesday
- RF recovery
- 12 GeV Inauguration(!) Tour
- Access to uninstall muon chamber
- Thursday
- TAC Run
- Longer term run plan/Other items
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Shutdown list
- Tuesday
- AOB
Monday, April 30 at 08:45
- Notes from the weekend:
- Issues:
- TOF voltage failure [11]
- Gluon49 failure
- Open Door
- Reports:
- Run Plan
- Monday
- Beam studies
- Accesses
- TOF
- FCal
- Muon Chamber
- Tuesday
- RF recovery (moved to Wednesday)
- Wednesday
- 12 GeV Inauguration(!) Tour
- TAC Run (Move to Thursday?)
- Longer term run plan/Other items
- Resumption of raster scan studies
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Monday
- AOB
Sunday, April 29 - No Meeting
Saturday, April 28 - No Meeting
Friday, April 27 at 08:45
- Notes from the previous 24 hours:
- Issues:
- Reports:
- High intensity DAQ tests [25]
- Running with 750 um converter [26]
- TPOL runtime estimate - R. Jones
- Run Plan
- Friday
- High rate DAQ tests (9.30 am)
- Injector recovery (MCC, possible beam down ~1hr)
- Level 1 trigger studies
- Saturday
- Production Running
- Sunday
- Production Running
- Longer term run plan/Other items
- Resumption of raster scan studies
- Access for Muon detector
- Tour
- TAC Run (Wednesday)
- End of run preparation
- Be prepared to switch everything off after last beam at 6 am, SUNDAY May 6
- Friday
- AOB
Thursday, April 26 at 08:45
- Notes from the previous 24 hours:
- Replacement of TAGH FDC module [27]
- Production running
- High rate trigger tests
- Issues:
- Reports:
- Run Plan
- AOB