Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"
From GlueXWiki
(→Saturday, May 5 at 08:45 (no meeting)) |
(→Saturday, May 5 at 08:45 (no meeting)) |
||
Line 26: | Line 26: | ||
#*Saturday | #*Saturday | ||
#** Production | #** Production | ||
− | #** Fast raster during swing shift (Michael, Richard): denied by, considered too risky with Michael on vacation and Richard off-site | + | #** Fast raster during swing shift (Michael, Richard): denied by crew chief, considered too risky with Michael on vacation and Richard off-site |
#** Trigger tests (Sasha): 9pm - 3am, trigger efficiency with ST, test with TOF trigger [https://logbooks.jlab.org/entry/3573788] | #** Trigger tests (Sasha): 9pm - 3am, trigger efficiency with ST, test with TOF trigger [https://logbooks.jlab.org/entry/3573788] | ||
#*Sunday | #*Sunday |
Revision as of 04:47, 6 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Saturday, May 5 at 08:45 (no meeting)
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- AOB
Friday, May 4 at 08:45
- Notes from the previous 24 hours:
- Issues:
- DAQ not starting, needed reboot of rocTRIG2
- MCC corrected beam position on AC
- RootSpy not starting, xMsg server reset [18]
- Reports:
- Run Plan
- Friday
- Fast raster scan (9am, 60min)
- TAC run (10am, 1 shift)
- Saturday
- Production
- Sunday
- 5am end of physics, 6am end of run, restricted access from 10am
- Week 17
- Friday
- AOB