Difference between revisions of "Run Planning Meeting Notes, May 2-May 6, 2018"
From GlueXWiki
(→Monday, May 7 at 08:45) |
(→Monday, May 7 at 08:45) |
||
Line 13: | Line 13: | ||
#** [https://halldweb.jlab.org/rcdb/runs/info/42538 #042538]: target empty, 30M events | #** [https://halldweb.jlab.org/rcdb/runs/info/42538 #042538]: target empty, 30M events | ||
#* [https://halldweb.jlab.org/rcdb/runs/info/42541 #042541]: raw mode run during target filling | #* [https://halldweb.jlab.org/rcdb/runs/info/42541 #042541]: raw mode run during target filling | ||
− | #* PS rate studies with different target densities | + | #* PS/SC rate studies with different target densities |
#* Fast raster during swing shift on Saturday (Michael, Richard): denied by crew chief, considered too risky with Michael on vacation and Richard off-site | #* Fast raster during swing shift on Saturday (Michael, Richard): denied by crew chief, considered too risky with Michael on vacation and Richard off-site | ||
#* Trigger tests (Sasha): Saturday 9pm - Sunday 3am, trigger efficiency with ST, test with TOF trigger [https://logbooks.jlab.org/entry/3573788] | #* Trigger tests (Sasha): Saturday 9pm - Sunday 3am, trigger efficiency with ST, test with TOF trigger [https://logbooks.jlab.org/entry/3573788] |
Latest revision as of 08:43, 7 May 2018
<- Back to Run Coordination Meetings:Fall2017 Spring2018 Run
Contents
Monday, May 7 at 08:45
- Notes from the previous 48 hours:
- Raster scan #042515 [1] [2] [3] [4]
- TAC runs:
- #042541: raw mode run during target filling
- PS/SC rate studies with different target densities
- Fast raster during swing shift on Saturday (Michael, Richard): denied by crew chief, considered too risky with Michael on vacation and Richard off-site
- Trigger tests (Sasha): Saturday 9pm - Sunday 3am, trigger efficiency with ST, test with TOF trigger [5]
- 5am end of physics, 6am end of run, restricted access from 10am
- Shutdown: [6][7][8][9]
- Issues:
- Reports:
- AOB
Saturday, May 5 at 08:45 (no meeting)
- Notes from the previous 24 hours:
- Issues:
- Reports:
- Run Plan
- AOB
Friday, May 4 at 08:45
- Notes from the previous 24 hours:
- Issues:
- DAQ not starting, needed reboot of rocTRIG2
- MCC corrected beam position on AC
- RootSpy not starting, xMsg server reset [32]
- Reports:
- Run Plan
- Friday
- Fast raster scan (9am, 60min)
- TAC run (10am, 1 shift)
- Saturday
- Production
- Sunday
- 5am end of physics, 6am end of run, restricted access from 10am
- Week 17
- Friday
- AOB