Difference between revisions of "June 7, 2018 DIRC Optical Box"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Optical Box Meeting<br> Thursday June 7, 2018<br> 10:00 am, EDT<br> JLab A110 <br> == Connection Using Bluejeans == # To join via Polyco...") |
(→Agenda) |
||
Line 20: | Line 20: | ||
#* Pre-brief material online by June 15 | #* Pre-brief material online by June 15 | ||
# Controls followup (Nick) | # Controls followup (Nick) | ||
+ | [[DIRC_Controls_6718.pdf]] | ||
# Optical box status | # Optical box status | ||
#* Status update (Ernie and Jason) | #* Status update (Ernie and Jason) |
Revision as of 07:21, 7 June 2018
Meeting Information
GlueX DIRC Optical Box Meeting
Thursday June 7, 2018
10:00 am, EDT
JLab A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcement
- Experimental Readiness Review June 25
- Pre-brief material online by June 15
- Controls followup (Nick)
- Optical box status
- Status update (Ernie and Jason)
- Box production at Lesker: report from visit
- PMT test fixture: Assembly procedure and discussion
- Window quotes and delivery schedule
- Dark box conceptual design
- Other items and quotes
- Status update (Ernie and Jason)
- Installation of bar boxes and optical box in Hall D
- Discussion of installation schedule in Hall D (Tim, et al)
- Discussion of assembly procedure and timeline:
- AOB