Difference between revisions of "July 12, 2018 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
Line 27: | Line 27: | ||
#** PMT test fixture and cookies (Maria) | #** PMT test fixture and cookies (Maria) | ||
#*** [https://www.dropbox.com/sh/hngiq5t6pzisor7/AACVkLB3TJTVJ7HC2heXCha2a?dl=0 Installation videos] | #*** [https://www.dropbox.com/sh/hngiq5t6pzisor7/AACVkLB3TJTVJ7HC2heXCha2a?dl=0 Installation videos] | ||
− | #** Dark box design | + | #** Dark box design: Air flow considerations and plan: |
− | + | #*** The power dissipated by each module is ~4 Watts, so the total in one optical box enclosure would be ~144 W. | |
− | # | + | #*** Maintain temperature < 50 C inside the box to keep local FPGA temperatures < 80 C |
− | # | + | #*** Uniform flow over electronics boards (Jason) |
− | # | + | |
#* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]] | #* [[Media:DIRC_INSTALL_SCHEDULEv2.pdf|DIRC installation schedule]] | ||
#* [[Media:DIRC_BBox_Flange_seal.jpg|DIRC BBox Split Flange Seal]] | #* [[Media:DIRC_BBox_Flange_seal.jpg|DIRC BBox Split Flange Seal]] |
Revision as of 08:46, 12 July 2018
Meeting Information
GlueX DIRC Meeting
Thursday July 12, 2018
10:00 am, EDT
JLab room A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Documentation wiki page DIRC
- Bar box transportation and installation: plans for a writeup? (Matt, et al.)
- Optical box
- Water quality plan (Tim, et al.)
- Fabrication status update (Ernie and Jason)
- Box production at Lesker: delivery date to Bates?
- Window procurement: delivery date to JLab?
- Assembly sequence and testing plans at Bates
- PMT test fixture and cookies (Maria)
- Dark box design: Air flow considerations and plan:
- The power dissipated by each module is ~4 Watts, so the total in one optical box enclosure would be ~144 W.
- Maintain temperature < 50 C inside the box to keep local FPGA temperatures < 80 C
- Uniform flow over electronics boards (Jason)
- DIRC installation schedule
- DIRC BBox Split Flange Seal
- Simulation studies (Maria and Roman)
- Writeup of LUT algorithm provided by Maria
- Implementation of reconstruction in PID library underway (Justin)
- MAPMT testing (Bill and Andrew)
- Magnetic field test (delayed by access to laser setup)
- Commissioning plans
- Reminder: Addressing ERR review recommendations
- Recommendations pertaining to Fall 2018 DIRC commissioning should be addressed by August 20 (close of Hall D for beam)
- AOB