Difference between revisions of "August 2, 2018 DIRC Optical Box"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Optical Box Meeting<br> Thursday August 2, 2018<br> 10:00 am, EST<br> JLab A110 <br> == Connection Using Bluejeans == # To join via Poly...") |
(→Agenda) |
||
Line 32: | Line 32: | ||
#*** Flow water through full system and establish controls, N2 purge, etc. | #*** Flow water through full system and establish controls, N2 purge, etc. | ||
# Mirror box laser alignment | # Mirror box laser alignment | ||
− | #* [https://halldweb.jlab.org/DocDB/0035/003581/002/ | + | #* [https://halldweb.jlab.org/DocDB/0035/003581/002/2018_Aug_02.pdf Update on geometry and laser projections] (Bill) |
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim) | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3521 Optical Box Alignment strawman] (Tim) | ||
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3578 Laser Alignment fixture] (Tim) | #* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=3578 Laser Alignment fixture] (Tim) | ||
# AOB | # AOB |
Latest revision as of 09:25, 2 August 2018
Meeting Information
GlueX DIRC Optical Box Meeting
Thursday August 2, 2018
10:00 am, EST
JLab A110
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcement
- Optical box status
- Fabrication status update (Ernie and Jason)
- Packing list for shipment to JLab:
- Component QA and assembly status at Bates
- Window frame modification
- Mirror strong back QA and mirror cutting/assembly
- Assembly sequence and testing plans at Bates
- Dark box enclosure development: air flow calculations
- Fabrication status update (Ernie and Jason)
- Installation schedule discussion:
- Requirements for mechanical install of optical box: Aug 10 installation schedule
- Delivery of outer optical box (mirror box not required), window, flange, and gasket by August 10
- Goals (reduce risk for final installation):
- Test water tightness of optical box and interface with bar boxes
- Flow water through full system and establish controls, N2 purge, etc.
- Requirements for mechanical install of optical box: Aug 10 installation schedule
- Mirror box laser alignment
- AOB