# Notes from the previous 24 hours:
 
# Notes from the previous 24 hours:
 +
#*Beam position erratic throughout the day & first half of swing [https://logbooks.jlab.org/entry/3599221 day]  [https://logbooks.jlab.org/entry/3598591 swing]
 +
#*Energy drift [https://logbooks.jlab.org/entry/3599126 pathlength corrected]
 +
#*Sergey completed first set of DAQ tests
 +
#*Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
 +
#*Collected 'production' data overnight, concerned about quality [https://logbooks.jlab.org/entry/3599614 cobrems gui]
 
#CEBAF:
 
#CEBAF:
#D:
 
#* Notable logbook entries
 
 
#Action Items:
 
#Action Items:
 +
#* Update reference plots
 
#Issues:  
 
#Issues:  
 +
#* Network problems
 
# Reports:
 
# Reports:
 
#*Monitoring  
 
#*Monitoring  
 
# Run Plan: [https://halldweb.jlab.org/wiki/images/a/a7/Fall18_week2.jpg Run plan]
 
# Run Plan: [https://halldweb.jlab.org/wiki/images/a/a7/Fall18_week2.jpg Run plan]
 +
#* Beam off at 9 for pass change
 +
#* Sasha PS and Richard TAGM threshold not done yet
 
#*Coordinate with C for TAC run - on or after Wed (otherwise need access), plan to install converter on Tuesday  
 
#*Coordinate with C for TAC run - on or after Wed (otherwise need access), plan to install converter on Tuesday  
 
#*[http://accboard.acc.jlab.org/ Acc whiteboard]
 
#*[http://accboard.acc.jlab.org/ Acc whiteboard]
 
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard]
 
#*[https://halldweb.jlab.org/online/whiteboard/ Counting house whiteboard]
 
# AOB
 
# AOB

Revision as of 07:09, 28 September 2018

<- Back to Run Coordination Meetings:Fall2018 Run

Friday, Sep 28 at 08:45

  1. Notes from the previous 24 hours:
    • Beam position erratic throughout the day & first half of swing day swing
    • Energy drift pathlength corrected
    • Sergey completed first set of DAQ tests
    • Stabilized mid-swing enough to attempt alignment but spot is huge 1.2 x 1.5mm
    • Collected 'production' data overnight, concerned about quality cobrems gui
  2. CEBAF:
  3. Action Items:
    • Update reference plots
  4. Issues:
    • Network problems
  5. Reports:
    • Monitoring
  6. Run Plan: Run plan
    • Beam off at 9 for pass change
    • Sasha PS and Richard TAGM threshold not done yet
    • Coordinate with C for TAC run - on or after Wed (otherwise need access), plan to install converter on Tuesday
    • Acc whiteboard
    • Counting house whiteboard
  7. AOB