#* Shifts were on standby until 8pm | #* Shifts were on standby until 8pm | ||
#* Hall went into beam permit ~8:30pm | #* Hall went into beam permit ~8:30pm | ||
− | #* Filled target, performed harp scans, checked radiation levels | + | #* Filled target, [https://logbooks.jlab.org/entry/3614961 performed harp scans], checked radiation levels |
#* Started taking data with AMO ~10:40pm | #* Started taking data with AMO ~10:40pm | ||
+ | #** Cycled through the production sequence | ||
+ | #** Collected ~800M Evts so far | ||
# Issues and current Status | # Issues and current Status | ||
+ | #* Minor DAQ crashes | ||
+ | #* No beam for ~15min, 1L22-7 tripped | ||
+ | #* Data taking runs smoothly right now | ||
# Reports | # Reports | ||
+ | #* Monitoring | ||
+ | #* [https://logbooks.jlab.org/entry/3615131 Rates after accel. tests] | ||
# Plans | # Plans | ||
+ | #* Keep taking data over the weekend | ||
+ | #* Any requests for additional tests/checks/measurements? | ||
# AoB | # AoB | ||
Revision as of 08:33, 26 October 2018
Friday, Oct 26 at 08:45
- Last 24h
- Shifts were on standby until 8pm
- Hall went into beam permit ~8:30pm
- Filled target, performed harp scans, checked radiation levels
- Started taking data with AMO ~10:40pm
- Cycled through the production sequence
- Collected ~800M Evts so far
- Issues and current Status
- Minor DAQ crashes
- No beam for ~15min, 1L22-7 tripped
- Data taking runs smoothly right now
- Reports
- Monitoring
- Rates after accel. tests
- Plans
- Keep taking data over the weekend
- Any requests for additional tests/checks/measurements?
- AoB
Thursday, Oct 25 at 08:45
- Last 24h
- Took data with 180nA beam until 9:00am
- Emptied target, coll. to block, gon. to blank
- FCAL Base replacements
- Issues and current Status
- Hall is in controlled access
- Accell.
- Extended phaser studies/tests into swing-shift
- Master Oscillator Modifications (MoMod) ~8h begin in swing-shift
- Earliest to expect beam: Around owl-shift (i.e. Friday)
- Reports
- Plans
- Today
- Work in hall (stay in controlled access)
- BCAL (Elton)
- TOF (Beni)
- Walk through(s)
- Shifts are on standby until 11:59pm today
- IF beam is back:
- Fill target, perform harp scans, check radiation levels, PS-rates,...
- Start data taking with AMO @ 180nA
- Work in hall (stay in controlled access)
- Upcoming days
- Take data as soon as beam is available
- Accel.
- Beam studies on Monday
- RF recovery for Tuesday, need to re-tune one of the cavitis
- Today
- AoB