Difference between revisions of "Run Planning Meeting Notes, Nov 8-Nov 14, 2018"
From GlueXWiki
(→Monday, Nov 12 at 08:45) |
|||
Line 13: | Line 13: | ||
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week8.jpg Hall D schedule for week 8] | *[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week8.jpg Hall D schedule for week 8] | ||
*[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9] | *[https://halldweb.jlab.org/wiki/index.php/File:Fall18_week9.jpg Hall D schedule for week 9] | ||
+ | |||
+ | == Tuesday, Nov 13 at 08:45 == | ||
+ | |||
+ | #Last 24h: | ||
+ | #* 9h+ scheduled down time due to system recovery | ||
+ | #* Preparations for beam pipe installation tomorrow | ||
+ | #* Upgrade to Hall D current locks + beam based test (30min) | ||
+ | #* Switch back to standard production running: | ||
+ | #** Ramp up PS magnet to 910A | ||
+ | #** Low-energy tagger counters off | ||
+ | #** Set coherent peak at 8.8GeV | ||
+ | #Issues | ||
+ | #Reports | ||
+ | #* [https://logbooks.jlab.org/entry/3625122 Rho polarization for low-energy run] (Alex) | ||
+ | #Plans | ||
+ | #* Beam Studies (Tuesday 08:30, 8h): installation of beam pipe | ||
+ | #Notes | ||
== Monday, Nov 12 at 08:45 == | == Monday, Nov 12 at 08:45 == |
Revision as of 17:14, 12 November 2018
<- Back to Run Coordination Meetings:Fall2018 Run
- Trigger graphs
- Trigger Spreadsheet
- Low energy running Trigger Spreadsheet
- Run Plan Google Calendar
- Accel. Plan Google Calendar
- Acc whiteboard
- Counting house whiteboard
- Hall D schedule for week 8
- Hall D schedule for week 9
Contents
Tuesday, Nov 13 at 08:45
- Last 24h:
- 9h+ scheduled down time due to system recovery
- Preparations for beam pipe installation tomorrow
- Upgrade to Hall D current locks + beam based test (30min)
- Switch back to standard production running:
- Ramp up PS magnet to 910A
- Low-energy tagger counters off
- Set coherent peak at 8.8GeV
- Issues
- Reports
- Plans
- Beam Studies (Tuesday 08:30, 8h): installation of beam pipe
- Notes
Monday, Nov 12 at 08:45
- Last 72h:
- 6h down time on Friday due to HV issue on RF cavity 1L23
- 12h down on Saturday due to 1L23 and more
- 4h down on Sunday
- Completed the goal of 5 full cycles (2B events) on Sunday ~5pm
- Issues
- Reports
- Plans
- System Recovery (Monday 07:30, 6h+): switching back to 8.8GeV running?
- Beam Studies (Tuesday 08:30, 8h): installation of beam pipe
- Notes
Friday, Nov 9 at 08:45
- Last 24h:
- >80% beam available, >95% used
- completed 2nd cycle
- harp scan ongoing
- Issues
- Sluggish CSS during the day, investigating
- Tagger dump BPM AD00c
- Reports
- Plans
- Beam Studies and System Recovery switched
- System Recovery (Monday 08:30): investigate water leak in tunnel, ~3h
- Beam Studies (Tuesday): high current test, halls A, B and C have to stayed locked, D optional
- Notes
Thursday, Nov 8 at 08:45
- Last 24h:
- TAC run with empty target, v-wire at 50nA, reduced field in PS (400A), low E TAGH counters on
- Harp Scan
- Beam tuning (deferred)
- Data taking with reduced PS field, coherent edge at 7GeV
- TAGH Rates (Amo), (Diamond), Coincidence Rates
- Low energy running Trigger Spreadsheet
- RF problems in the night
- Issues
- PS and PSC coincidence scalers frozen, ps_client running on gluon100 restarted, instructions in hdops wiki
- beam position went awry, rates soared, reference module for IOC reading out 5C11B failed, replaced
- EPICS froze for 2h, started working without intervention, now again unresponsive
- Target PTR turned off, do not ignore any alarms!
- Reports
- Plans
- Notes