Thursday, Nov 15 at 08:45
- Last 24h:
- Standard production running
- Issues
- CBrem gui not fitting and the coherent edge has been drifting. Decided (6am) to stop run on diamond, do Harp scan and continue with amorphous run, then TAC until the problem is fixed.
- Convergence optimization failed because optics has drifted compared to yesterday, the basis for how to carry the optimization. Rates after optimization did not show improvement.
- Beam current has been unusually unstable yesterday [Some fluctuations of current correlates with beam position drift https://logbooks.jlab.org/entry/3626367]
- Reports
- Monitoring (Thomas)
- Plans
- Monday maintenance is moved to today, noon-3/4pm.
- Access to move back the lump monitor
- Other access?
- TAC run this morning/afternoon. With V-wire? Postponed it?
- Optics adjustment? (Todd/Jay) 30 min.
- Production running
- Monday maintenance is moved to today, noon-3/4pm.
- Discussion ComCal commissioning
- Notes