#**[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops] | #**[https://logbooks.jlab.org/entry/3650761 ], [https://logbooks.jlab.org/entry/3650010 ] DAQ lifetime sometimes drops] | ||
#**TOF RF status? | #**TOF RF status? | ||
− | #Today's plan | + | #Today's plan (changed this morning at the 8:00am MCC meeting) |
− | #*8am: Hall | + | #*8am-9:30am: High beam current push for Hall C. At best, low quality beam, very trippy. We maintain the planned access for Hall D |
+ | #*9:30am-??12:30am-2:30am?? RF recovery: No beam | ||
+ | #*After RF recovery: spin dance for Hall B. | ||
+ | #**Minimally invasive: 2 or 3 instances of 20 min beam off for spin angle rotation at the source. Beam available in between. | ||
+ | #** Restart DIRC commissioning. | ||
#*[https://cebaf.jlab.org/files/ops/accboard/ MCC white board] | #*[https://cebaf.jlab.org/files/ops/accboard/ MCC white board] | ||
#*[https://halldweb.jlab.org/wiki/images/6/64/Spring19_week1.jpg This week time chart] | #*[https://halldweb.jlab.org/wiki/images/6/64/Spring19_week1.jpg This week time chart] | ||
#*[https://halldweb.jlab.org/online/whiteboard/ Hall D white board] | #*[https://halldweb.jlab.org/online/whiteboard/ Hall D white board] |
Revision as of 09:38, 11 February 2019
Monday, Feb. 11 at 08:45
- Notes from the past 72 hours:
- Beam restoration, system checkout and start of DIRC commissioning going well.
- Issues
- Harp at 5C11, Harp at 5C11b, Hall D harp+ fit, Coherent peak as of this morning Beam convergences probably bad. Do we want to address this?
- [1], [2] DAQ lifetime sometimes drops]
- TOF RF status?
- Today's plan (changed this morning at the 8:00am MCC meeting)
- 8am-9:30am: High beam current push for Hall C. At best, low quality beam, very trippy. We maintain the planned access for Hall D
- 9:30am-??12:30am-2:30am?? RF recovery: No beam
- After RF recovery: spin dance for Hall B.
- Minimally invasive: 2 or 3 instances of 20 min beam off for spin angle rotation at the source. Beam available in between.
- Restart DIRC commissioning.
- MCC white board
- This week time chart
- Hall D white board