Line 20: | Line 20: | ||
#* Problematic FCAL channels near beamline | #* Problematic FCAL channels near beamline | ||
##* One base lost connection and was recovered by power cycling the power supply. This happens 1-2 times per week. Right now I (Colin) am the only one capable of doing this. Need to train more people how to spot and fix these errors. It is a relatively simple process, but one that should not be left to the shift crew. | ##* One base lost connection and was recovered by power cycling the power supply. This happens 1-2 times per week. Right now I (Colin) am the only one capable of doing this. Need to train more people how to spot and fix these errors. It is a relatively simple process, but one that should not be left to the shift crew. | ||
− | ##* [https://logbooks.jlab.org/entry/3667944 One base lost HV near beam line.][https://logbooks.jlab.org/entry/3668146 Follow up.] Access to replace after morning meeting. Friendly reminder: please do not call Colin at night about | + | ##* [https://logbooks.jlab.org/entry/3667944 One base lost HV near beam line.][https://logbooks.jlab.org/entry/3668146 Follow up.] Access to replace after morning meeting. Friendly reminder: please do not call Colin at night about base problems. Emails and texts are fine. |
#* [https://logbooks.jlab.org/entry/3668020 Monitoring problem with file/DB management. Usually does not happen] | #* [https://logbooks.jlab.org/entry/3668020 Monitoring problem with file/DB management. Usually does not happen] | ||
#* David and Thomas looking into CCAL pedestal Rootspy issue. Appears to be a Rootspy display issue and Dave will investigate more next week. | #* David and Thomas looking into CCAL pedestal Rootspy issue. Appears to be a Rootspy display issue and Dave will investigate more next week. |
Revision as of 08:43, 15 March 2019
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Friday, Mar. 15 at 08:45
- Past 24 hours:
- Short access after meeting
- gluon01 is back with a new kernel and graphics driver
- Production running
- Issues
- Problematic FCAL channels near beamline
- One base lost connection and was recovered by power cycling the power supply. This happens 1-2 times per week. Right now I (Colin) am the only one capable of doing this. Need to train more people how to spot and fix these errors. It is a relatively simple process, but one that should not be left to the shift crew.
- One base lost HV near beam line.Follow up. Access to replace after morning meeting. Friendly reminder: please do not call Colin at night about base problems. Emails and texts are fine.
- Monitoring problem with file/DB management. Usually does not happen
- David and Thomas looking into CCAL pedestal Rootspy issue. Appears to be a Rootspy display issue and Dave will investigate more next week.
- Reports
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running
- TAC run
- Hall A performing beam modulation studies Tuesday owl shift. Will cause 1 MeV fluctuations in beam energy. They will do a test Monday morning from 8-9am.
Thursday, Mar. 14 at 08:45
- Past 24 hours:
- Production running
- Issues
- RootSpy Problem with CCAL Pedestal Histograms
- Hall D y position variation from Jay. Beam position variation not related to dispersion.12
- Console 1 frozen. Who knows how to reboot?
- Reports
- Rate monitoring (Alexandre)
- FCAL shift in simulation (Liping)
- Beni really wanted to conitune our discussion yesterday on histogram binning (Beni)
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running
- Hall C goes down Sunday at 4pm. Postpone TAC run until Monday unless there are objections.
- There are parity quality beam testes (PQB) scheduled for Hall A Monday and Tuesday, but this should not affect the beam delivered to us.
- RF Recovery scheduled for Wednesday