Difference between revisions of "Run Planning Meeting Notes, Mar 21 - Mar 27, 2019"
From GlueXWiki
(→Wednesday, Mar. 27 at 08:45) |
(→Wednesday, Mar. 27 at 08:45) |
||
Line 97: | Line 97: | ||
== Wednesday, Mar. 27 at 08:45 == | == Wednesday, Mar. 27 at 08:45 == | ||
# Past 24 hours: | # Past 24 hours: | ||
− | #* access day shift on Tuesday, filled the He target, out by 11: | + | #* access day shift on Tuesday, filled the He target, out by 11:40pm |
− | #* beam restored by | + | #* beam restored by 13:10, harp scans, running resumes at 13:30 |
#* He-target running continues | #* He-target running continues | ||
# Issues | # Issues | ||
#* big changes in beam x position at dump during early morning ([https://logbooks.jlab.org/entry/3672308 logentry 3672308, see IPMAD00C.XPOS]) | #* big changes in beam x position at dump during early morning ([https://logbooks.jlab.org/entry/3672308 logentry 3672308, see IPMAD00C.XPOS]) | ||
+ | #* Alexandre explains this as a change in tagger dipole field ([https://logbooks.jlab.org/entry/3672359 logentry 3672359]) | ||
+ | #* tagger NMR probe reading was not updating, restored after ioc reset ([https://logbooks.jlab.org/entry/3672433 logentry 3672433]) | ||
+ | #* beam energy drifts by ~10 MeV over several hours ([https://logbooks.jlab.org/entry/3672471 logentry 3672471]) | ||
+ | #* older-model HV crate moved from compcal/dirc to CDC, newer-model HV crate swapped from CDC to compcal/dirc (WHY NO LOG ENTRY?) | ||
+ | #* after startup, discovered TOF HV was not fully on, recovered after ~30min lost ([https://logbooks.jlab.org/entry/3672310 logentry 3672310]) | ||
+ | #* AC beam positions seem more stable with improved slow-lock ([https://logbooks.jlab.org/entry/3672487 logentry 3672487]) | ||
+ | |||
+ | |||
+ | |||
# Reports | # Reports | ||
# Today: | # Today: | ||
# Run Plan | # Run Plan | ||
#* Production running continues | #* Production running continues |
Revision as of 07:31, 27 March 2019
Contents
- Run_Coordination_Meetings:Spring2019_Run
- PrimEx daily meeting
- PrimEx-η run plan
- Production runs, number of triggers
- Trigger counter
- To join via a Web Browser, go to the page https://bluejeans.com/660743227
Thursday, Mar. 21 at 08:45
- Past 24 hours:
- RF recovery during the day shift
- Beam recovery delayed due to (1) issue in the injector, resolved by evening, then (2) UPS battery needs replacement in the north linac.
- Issues
- low counts seen in bcal sector (logbook entry 3670196)
- Reports
- helium target refilled, ready
- trigger rate and beam flux history for Spring 2019 run
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running: when beam returns, check beam conditions as follows:
- do harp scans, both accelerator and Hall D radiator
- check radiation monitor rates in tagger hall and Hall D
- verify transmission in PSC and PS coincidence rates @ 200nA, 1e-4 radiator
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
- Production running: when beam returns, check beam conditions as follows:
Friday, Mar. 22 at 08:45
- Past 24 hours:
- beam recovery, conditions checked, running resumed.
- Issues
- HV tripped on two inner FCal blocks (logbook entry 3670196)
- HV in CDC tripped, without alarm! (logbook entry 3670885)
- Reports
- collimator transmission drops again (logbook entry 3670862)
- Today:
- Production: 200nA, Al 10-4
- Run Plan
- Production running continues
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
Monday, Mar. 25 at 08:45
- Past 72 hours:
- production running on He target until Sunday 5:30pm
- continued running on empty target through Monday 8:30am
- now in controlled access, RF recovery underway
- Issues
- Ongoing issue with CDC HV readback (logbook entry 3670885, 3671598, 3671943)
- PS scalers communication issue (logbook entry 3670950)
- DAQ interruptions ~1 per shift, recovery is straight-forward ([1], [2])
- Compcal monitoring plots, timing shows double peak, considered ok (logbook entry 3671757)
- Compcal HV communication failure (logbook entry 3671849 around 1:00am)
- FCal HV communication failure (logbook entry 3671351)
- Individual FCal bases need reset (logbook entry 3671386, resolved here)
- FCal fadc scalers stop updating (logbook entry 3671880)
- Accelerator tightens AC lock constraints (logbook entry 3671930)
- Reports
- Several reference plots for monitoring histograms out of date (logbook entry 3671340)
- Active collimator lock is mostly working, sometimes fights to keep up (logbook entry 3671214)
- Accelerator using machine development time to investigate this effect in Hall D
- Today:
- work on solenoid during 9:00am - 12:00pm, warm-up to begin (logbook entry 3670889)
- accelerator plans to work on Hall D line optics during second half of day shift
- Run Plan
- Production running continues
- Beam studies planned for day shift on Monday
- RF Recovery scheduled for Tuesday
Tuesday, Mar. 26 at 08:45
- Past 24 hours:
- access day shift on Monday, out at 3:00pm
- beam restored by 18:30
- empty-target running continues
- Issues
- Ongoing problems with dropped communication to CDC HV crate (logbook entry 3671943, crate rebooted)
- Reboot of CompCal HV crate failed to restore comms, crate is replaced (logbook entry 3671980)
- Accelerator switched to manual current adjustment overnight, attenuator problems (logbook entry 3672307)
- Ongoing DAQ issues (logbook entry 3672178)
- Advice to shift crew
- shift summaries are great for overview of what happened during a shift
- this summary is NOT a replacement for separate logbook entries related to exceptional conditions or events
- PLEASE make separate logbook entries to report ANY SIGNIFICANT ISSUES that come up!
- without these, it is difficult to search the record, create follow-up entries, post plots, etc.
- Reports
- solenoid warm-up underway (logbook entry 3671978)
- Updated normalized trigger rates history (logbook entry 3672059)
- Near-line FCAL gains calibration (logbook entry 3672065)
- Tagger accidentals fraction (logbook entry 3672169)
- Today:
- machine rf recovery during day shift
- did we get enough empty target data, are we ready to fill the He target?
- Run Plan
- Production running continues
Wednesday, Mar. 27 at 08:45
- Past 24 hours:
- access day shift on Tuesday, filled the He target, out by 11:40pm
- beam restored by 13:10, harp scans, running resumes at 13:30
- He-target running continues
- Issues
- big changes in beam x position at dump during early morning (logentry 3672308, see IPMAD00C.XPOS)
- Alexandre explains this as a change in tagger dipole field (logentry 3672359)
- tagger NMR probe reading was not updating, restored after ioc reset (logentry 3672433)
- beam energy drifts by ~10 MeV over several hours (logentry 3672471)
- older-model HV crate moved from compcal/dirc to CDC, newer-model HV crate swapped from CDC to compcal/dirc (WHY NO LOG ENTRY?)
- after startup, discovered TOF HV was not fully on, recovered after ~30min lost (logentry 3672310)
- AC beam positions seem more stable with improved slow-lock (logentry 3672487)
- Reports
- Today:
- Run Plan
- Production running continues