Difference between revisions of "June 11, 2019 DIRC"
From GlueXWiki
(Created page with "== Meeting Information == GlueX DIRC Meeting<br> Tuesday June 11, 2019<br> 1:00 pm, EDT<br> JLab Hall D <br> == Connection Using Bluejeans == # To join via Polycom room syst...") |
|||
Line 21: | Line 21: | ||
#* PMT module installation and optical coupling (Greg/Yunjie/All) | #* PMT module installation and optical coupling (Greg/Yunjie/All) | ||
#* Plans for installation on support structure and detector checkout (All) | #* Plans for installation on support structure and detector checkout (All) | ||
− | # [[Spring 2019 DIRC Commissioning Analysis]] (All) | + | # [[Spring 2019 DIRC Commissioning|Spring 2019 DIRC Commissioning Analysis]] (All) |
#* Reconstruction with FastDIRC (Yunjie) | #* Reconstruction with FastDIRC (Yunjie) | ||
#* Commissioning analyses (Ahmed) | #* Commissioning analyses (Ahmed) |
Revision as of 07:43, 10 June 2019
Meeting Information
GlueX DIRC Meeting
Tuesday June 11, 2019
1:00 pm, EDT
JLab Hall D
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements
- Summer installation work:
- Window installation and water test (All)
- PMT module installation and optical coupling (Greg/Yunjie/All)
- Plans for installation on support structure and detector checkout (All)
- Spring 2019 DIRC Commissioning Analysis (All)
- Reconstruction with FastDIRC (Yunjie)
- Commissioning analyses (Ahmed)
- Software/simulations
- Finalizing DIRC "as-built" geometry: JT model from survey/alignment (Yunjie/Stephanie)
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB