Difference between revisions of "Tagged Beam Group Engineering Drawings"
From GlueXWiki
Line 21: | Line 21: | ||
* Conceptual design of shielding plan from Connecticut ''(5/2006)'' | * Conceptual design of shielding plan from Connecticut ''(5/2006)'' | ||
* Civil design produced by engineering firm for JLab ''(10/2007)'' | * Civil design produced by engineering firm for JLab ''(10/2007)'' | ||
− | [http://www.jlab.org/~whitey/Collimator/ | + | [http://www.jlab.org/~whitey/Collimator/Glue-X Collimator-Revision-06-Aug-20-08.pdf Collimator Cave Layout Aug 20, 2008] - ''Aug 20, 2008'' |
[http://www.jlab.org/~whitey/Collimator/Gluex_collimator_isometric.pdf Collimator Cave Isometric Jul 18, 2008] - ''July 18, 2008'' | [http://www.jlab.org/~whitey/Collimator/Gluex_collimator_isometric.pdf Collimator Cave Isometric Jul 18, 2008] - ''July 18, 2008'' |
Revision as of 13:26, 20 August 2008
Contents
Tagging Spectrometer
- Conceptual drawings produced by the Glasgow group (ca. 2006)
- 35% drawings produced by the IHEP group (5/2007)
- Interface drawings produced at JLab (1/2008)
Tagger magnet and chamber section 1 July, 30, 2008 - July 30, 2008 Tagger magnet and chamber section 2 July, 30, 2008 - July 30, 2008
Broadband Tagger Hodoscope
- 35% drawings produced by Catholic Univ. (5/2007)
Tagger Microscope
- 35% drawings produced by Univ. Connecticut (5/2007)
Active Collimator
- 100% drawings produced by Univ. Connecticut (6/2006)
Tagger Hall
- Civil design produced by engineering firm for JLab (10/2007)
Collimator Cave
- Conceptual design of shielding plan from Connecticut (5/2006)
- Civil design produced by engineering firm for JLab (10/2007)
Collimator-Revision-06-Aug-20-08.pdf Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008