* The electronics for three of the GEM packages are readout limited to ~3kHz | * The electronics for three of the GEM packages are readout limited to ~3kHz | ||
* At least one large dataset at each of the 3 TRD positions will be required with the full readout for tracking and alignment studies with the full solenoid field | * At least one large dataset at each of the 3 TRD positions will be required with the full readout for tracking and alignment studies with the full solenoid field | ||
− | ** Beam CENTER: [https://halldweb.jlab.org/rcdb/runs/search?runFrom=70000&runTo=79000&q=%27FCAL_TRACK_CENT%27+in+run_config+and++solenoid_current%3E1000 Runs | + | ** Beam CENTER: [https://halldweb.jlab.org/rcdb/runs/search?runFrom=70000&runTo=79000&q=%27FCAL_TRACK_CENT%27+in+run_config+and++solenoid_current%3E1000 Runs 70951-70992] taken with FCAL_TRACK_CENTER configuration |
** Beam LEFT: [https://halldweb.jlab.org/rcdb/runs/search?runFrom=70000&runTo=79000&q=%27FCAL_TRACK_LEFT%27+in+run_config+and++solenoid_current%3E1000 Runs 71013-?????] taken with FCAL_TRACK_LEFT configuration | ** Beam LEFT: [https://halldweb.jlab.org/rcdb/runs/search?runFrom=70000&runTo=79000&q=%27FCAL_TRACK_LEFT%27+in+run_config+and++solenoid_current%3E1000 Runs 71013-?????] taken with FCAL_TRACK_LEFT configuration | ||
+ | |||
+ | Note: Data from Runs 70850-70895 [https://logbooks.jlab.org/entry/3750309 were lost due to data transfer mistake]. So although they may have events listed in RCDB, the data are not available. |
Revision as of 16:23, 14 December 2019
Straight-track data
- For alignment of the GEM/TRD we need to acquire production samples with the magnetic field off
- Straight-track sample at each of the 3 TRD positions with the full GEM readout for tracking and alignment studies
- Beam LEFT: Runs 70703-70721 taken with FCAL_TRACK_LEFT configuration
- Beam RIGHT: Runs 70728-70751 taken with FCAL_TRACK_RIGHT configuration
- Beam CENTER: Runs 70757-70786 taken with FCAL_TRACK_CENT configuration
Full GEM readout: tracking mode
- The electronics for three of the GEM packages are readout limited to ~3kHz
- At least one large dataset at each of the 3 TRD positions will be required with the full readout for tracking and alignment studies with the full solenoid field
- Beam CENTER: Runs 70951-70992 taken with FCAL_TRACK_CENTER configuration
- Beam LEFT: Runs 71013-????? taken with FCAL_TRACK_LEFT configuration
Note: Data from Runs 70850-70895 were lost due to data transfer mistake. So although they may have events listed in RCDB, the data are not available.