# Insert desired radiator (e.g., diamond or 3x10^-4 RL amorphous) | # Insert desired radiator (e.g., diamond or 3x10^-4 RL amorphous) | ||
# Amorphous radiator retracted | # Amorphous radiator retracted | ||
− | # Move collimator to 5.0 mm diameter hole (can be done in parallel with previous | + | # Move collimator to 5.0 mm diameter hole (can be done in parallel with previous steps) |
# Ask for the appropriate current CW beam to be restored | # Ask for the appropriate current CW beam to be restored | ||
# Refer to [https://halldweb.jlab.org/hdops/wiki/index.php/Standard_Production_Running_Conditions this wiki page] for standard production conditions | # Refer to [https://halldweb.jlab.org/hdops/wiki/index.php/Standard_Production_Running_Conditions this wiki page] for standard production conditions |
Revision as of 17:30, 3 March 2020
Contents
Set up harp scan
- Ask MCC to stop beam delivery in preparation for harp scans
- Remove all radiators (BLANK or RETRACTED)
- Move collimator to blocking position
Perform accelerator harp scans
- Ask MCC for three harp scans: 5C11, 5C11B, and tagger dump (AD00)
- Remind MCC that all three should be done with tune beam
Perform radiator harp scan
- Ask for 200 nA CW beam
- Perform radiator harp scan as described in this wiki page
Restore Production conditions
- Ask MCC to take beam away and mask FSD for radiator movement
- Insert desired radiator (e.g., diamond or 3x10^-4 RL amorphous)
- Amorphous radiator retracted
- Move collimator to 5.0 mm diameter hole (can be done in parallel with previous steps)
- Ask for the appropriate current CW beam to be restored