Difference between revisions of "Π polarizability Meeting Jun 17, 2020"
From GlueXWiki
(Created page with "=Meeting Info.= == Meeting Time And Location == 9:00 EST (JLab time) CC L207 ==Connecting== <div class="toccolours mw-collapsible mw-collapsed"> You can connect using [https...") |
(→Agenda) |
||
Line 49: | Line 49: | ||
## [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4416 Screen Shots of Mechanical Design Apr 2 and 23] | ## [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4416 Screen Shots of Mechanical Design Apr 2 and 23] | ||
## [[May 21, 2020 CPP Design Meeting]] | ## [[May 21, 2020 CPP Design Meeting]] | ||
+ | ## [[Media:D00000-00-00-1019 REV-.pdf DIRC Installation Drawings]] | ||
## Beam test | ## Beam test | ||
# [https://userweb.jlab.org/~ilarin/cpp/trig.pdf TOF trigger rate reproducability during spring 2020 run] (Ilya) | # [https://userweb.jlab.org/~ilarin/cpp/trig.pdf TOF trigger rate reproducability during spring 2020 run] (Ilya) |
Revision as of 08:11, 11 June 2020
Contents
Meeting Info.
Meeting Time And Location
9:00 EST (JLab time)
CC L207
Connecting
You can connect using BlueJeans Video conferencing (ID: 949 429 419). (Click "Expand" to the right for details -->):
- Make sure you have created a BlueJeans account via your JLab CUE account using this link:
- http://jlab.bluejeans.com (You should only need to do this once)
- Meeting ID: 949 429 419
- (you may need to type this in, depending how you connect)
- If connecting via Web Browser: click this link (no passcode is needed):
- If connecting via iOS or Android App:
- Use your JLab e-mail address to log in and then enter the meeting ID given above to join the meeting
- If connecting via Phone: Dial one of the following numbers and then enter the meeting ID above and hit "#" or "##"
- Dial: (408) 740-7256 (US or Canada only)
- or, List of International Numbers
- If connecting via Polycom unit:
- Dial 199.48.152.152 or bjn.vc
- Enter meeting ID above
Action Items
Agenda
- Previous meeting: Jun 10, 2020
- Announcements
- Update on Engineering/Design
- TOF trigger rate reproducability during spring 2020 run (Ilya)
- Studies on shielding thickness (Ilya)
- Data Analysis (Andrew)
- Preparations for Jeopardy
- Other business
- Next meeting
Minutes
TBD