Friday, August 14
- Last 24 hours
- Stable-ish beam through yesterday to this morning, ~1.3 B triggers collected
- Beamline Turbo pump controller failed, Keith
- Reports/Issues
- Need to pay special attention to the coherent peak position
- Amount of adjust (to the coherent peak) is increased (45/135) each time we change orientation
- Amo to 0/90 para requires (Beni)
- Beam drift due to lost beam lock.
- Need to pay special attention to the coherent peak position
- Pending issues:
- TagM card issue:
- FCAL remote controller PDU reset. (No reset planned for other three PDUs)
- Run Plan
- No long beam trips, no harp yesterday. Next harp scan?
- Production
- Hall C path change tentatively at August 24th (for three days). Question regarding beam stability and maximum current is raised to Jay, being discussed amount experts. Possible solution: tune beam two a shift to stabilize the lock; Use AD00 BCM as BPM, etc. Jay will get back to me.
- CPP installation:
- CPP's preference: schedule the CPP test after Aug 21.
- Maintenance schedule to be decided.
Thursday, August 13
- Announcement
- Current run period has be extended to September 21.
- Updated shift list
- Last 24 hours
- Unstable beam yesterday swing shift due to Hall C Moller measurement: 4:00-7:00 pm, 350nA tripping off AD00, unstable 240 nA available.
- Stable beam established after 7:30 pm yesterday.
- Diamond (JD-105 45/135) alignment completed by Hovanes during his shift
- TAGH scan completed by Sasha during his shift [1]
- Reports/Issues
- Run Plan
- Next harp scan?
- Production
- Hall C path change tentatively at August 24th (for three days). Impact initial 3 days of running without orbit lock (Hall A is off in the same time), 350nA beam will trip AD00.
- CPP installation:
- CPP's preference: schedule the CPP test after Aug 21.
- Installation to be completed during the next maintenance day. Date undecided, Jay will inform me as soon as he decided.
- Report/test
- DIRC/COMCAL HV CAEN reboot test (Hovanes)
- Small beam energy-current correlation (Alex)
- Pending issues:
- TagM card issue, any update?