Run Planning Meeting Notes, December 9 - December 15, 2021
From GlueXWiki
Wednesday November 9
- Last 24h:
- Issues
- Hall D beam stopper cause almost four hours of down time [5] We recovered the beam at 15:20 pm. The biggest suspect is an air pressure issue that caused a "beam stopper stuck" fault within PLC. The cause needs further investigation.
- Solenoid dumb due to a lost communication with both VCL flows for over 1 minute [6][7] (Tim & Nick)
- Plans
- Beam Studies next Tuesday, Dec 14