Mini BCAL Channel Study
From GlueXWiki
The mini BCAL Module tests
On 3rd March 2023, Chris set up a LED pulsar box to verify the working of the SiPM modules that will be used for the mini BCAL EIC test.
- Module-49 and Module-50 were spares for the BCAL modules for 2011 that were tested during this study.
The setup
A table summarizing the result of the test is shown below
Upstream Channel | Upstream Signal (Supply 74 V) | Upstream Properties | Downstream Channel | Downstream Signal (Supply 74 V) | Downstream Properties |
---|---|---|---|---|---|
AU0 | a | AD0 | a | ||
AU1 | AD1 | ||||
AU2 | AD2 | ||||
AU3 | AD3 | ||||
AU4 | AD4 | ||||
AU5 | AD5 | ||||
AU6 | AD6 | ||||
AU7 | AD7 | ||||
AU8 | AD8 | ||||
AU9 | AD9 | ||||
AU10 | AD10 | ||||
AU11 | AD11 | ||||
AU12 | AD12 | ||||
AU13 | AD13 | ||||
AU14 | AD14 | ||||
AU15 | AD15 |