Coil Test Weekly Meeting 14-Jan-2010
From GlueXWiki
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 14-Jan-2010 9:45 am ARC 428
Agenda
- Do we have enough ControlNet and/or Ethernet/IP modules? - Elliott, Scot
- Status of PLC programming - Mark W
- A-B EWEB module for web access (example page)- Elliott
- Finalizing P&I diagram, including machine protection systems - George, Josh, Scot, Elliott
- Final narrative including cryo, power and machine protection to Mark W - George
- Install Point I/O system in ARC 101 - Elliott
- What controls equipment still hasn't arrived - Scot
- Wiring progress in F117 - Scot
- A-B keyed terminal blocks - Elliott
- Ethernet/IP only A-B control system - Elliott
- FastTrack schedule status - George, Chuck
- Status of controls drawings and wiring lists - Scot
- Coil 1 cryostat testing status - George
- Construction/installation sequence drawings - George
- Status of interface to cryo can - George
- Status of pressure relief system design - George
- Coil 1 status - George
- Coil 2 cost and schedule - George
- Coil 3 statement of work, visit and IUCF contract - George, Tom
- Coil 4 controls wiring replacement - George
- Shipping rails and transportainer from IUCF - Chuck
- Arrange for electrical work in Test Lab - Tom
- Arrange for telecom in Test Lab - Elliott
- Arrange for networking in Test Lab - Elliott
- GN2 vent piping system - Tom
- QWeak area, bigger door in F117 - Tom
- Locating computer in SRF control room - Elliott
- Backup computer - Elliott
- Safety reviews: when to start formal process - George, Elliott
- 5 G contours - George
- Coil Test Top To-Do items