Microscope Prototype Beam Test
From GlueXWiki
The purpose of this note is to gather all the information pertinent to the beam test of the tagger microscope prototype in Hall B planned for the fall of 2010.
Contents
Introduction
- Proposal: [link TBA]
Schedule
- JLab visit dates by UConn group:
- Oct 8-15, 2010 (personnel: Richard J., Igor S.) Goals:
- instrumentation staging - testing of DAQ with microscope out of the Hall (on the bench)
- Oct 8-15, 2010 (personnel: Richard J., Igor S.) Goals:
Setup
Counter positioning
- Hall B Tagger Montecarlo
- Source [link TBA]
- Results [TBA]
- Selected position: [info TBA]
- Coordinates:
- Position instructions:
- x-axis: the line marked on the sides of the foil window indicates the 0±2mm position of the scintillating fibers. (±8mm motion is possible)
- Discriminator selection/positioning instructions:
DAQ setup
Configuration
Connection/Operation instructions
- interface?
- remote connection?