Minutes-2-24-2011
From GlueXWiki
February 24, 2011 FDC meeting
Agenda
- Production (David)
- Blue Crab status
- Readiness review
- Electronics (Fernando, Roger)
- Foil production: Allflex responce
- Other: solder for wires
- Engineering (Bill, David, Lubomir)
- Lessons learned from the test wire plane FDC Log Book, page 552
- Other: epoxy
- Chamber testing
- Tests with the middle chamber (Lubomir)
- Other
Minutes
Participants: Eugene, Bill, Dave, Roger, Simon, Beni, and Lubomir.
Production
- Dave: everything moved to Blue Crab (stringing table was moved there right after the meeting). We have there office with computers connected to network. Preparing for the PCB gluing. Bill regarding the stringing table: the pin rail was modified at the machine shop, ready together with the other parts to be mounted on the table at Blue Crab.
- We will have a readiness review in a month from now. Dave and Bill will work on the procedures/travelers/QA documents that are needed for the review.