Minutes-2-24-2011
February 24, 2011 FDC meeting
Agenda
- Production (David)
- Blue Crab status
- Readiness review
- Electronics (Fernando, Roger)
- Foil production: Allflex responce
- Other: solder for wires
- Engineering (Bill, David, Lubomir)
- Lessons learned from the test wire plane FDC Log Book, page 552
- Other: epoxy
- Chamber testing
- Tests with the middle chamber (Lubomir)
- Other
Minutes
Participants: Eugene, Bill, Dave, Roger, Simon, Beni, and Lubomir.
Production
- Dave: everything moved to Blue Crab (stringing table was moved there right after the meeting). We have there office with computers connected to network. Preparing for the PCB gluing. There was a problem with the lights there again. Bill regarding the stringing table: the pin rail was modified at the machine shop, ready together with the other parts to be mounted on the table at Blue Crab.
- We will have a readiness review in a month from now. Dave and Bill will work on the procedures/travelers/QA documents that are needed for the review. Beni will set up a page with the agenda, similar to that for the CDC review, where we will link all the documents. According to Eugene the review will be more technical than administrative.