GlueX TOF Meeting, June 23, 2011
Contents
Location, Time
NOTE: Non-standard room, date, and time!
Thursday, May 23, 2011
11:00 am EDT
JLab: CEBAF Center, Room L207
Agenda
- Announcements
- Minutes from the last meeting
- Mantis task tracker project for TOF: Mark
- Prototype Status [1]
- Contract Status
- Meeting time
Communication
Videoconference
- ESNet: 8542553
- EVO: EVO site
- direct meeting link
- Phone Bridge ID: 10 1295
Telephone
- dial:
- US and Canada: (866)740-1260 (toll free)
- International: (303)248-0285 (toll call) or look up toll-free number at http://www.readytalk.com/intl
- enter access code followed by the # sign: 3421244#
Slides
Talks can be deposited in the directory /group/halld/www/halldweb1/html/talks/2011-2Q
on the JLab CUE. This directory is accessible from the web at https://halldweb1.jlab.org/talks/2011-2Q/ .
Minutes
Present:
- FSU: Sasha Ostrovidov
- JLab: Paul Eugenio, Chuck Hutton, Mark Ito, Simon Taylor, Tim Whitlatch, Beni Zihlmann
Paul machine out of single piece want far enought awy to put shielding on shielding support, light guid support light guide glued to scint tim: how to attach to fcal - lots of decisions
definition of light guide, need paul will send chuck specification of pmt geometry
two options: 1 bend lucite 2 machine out of single piece
paul arrange conference call on how to transmit 3-d design to nc machine
question on material 3" rod, ng, need 3.5" rod up to 3" standard price goes up from 3" to 3.5" up by factor of 2.5
meeting designers thu, 11 am 30th
material for 3.5" send me what you want
is uvt required
vapor polishing: free trial offer, for light guides paul will send out information
paul will write draft statement of work with specification
send to mark and will be reviewed
do pmt's need specification in fsu contract
meeting time, 10 am on thursdays