Minutes-7-19-2012
From GlueXWiki
July 19, 2012 FDC meeting
Agenda
- Production Construction Tracking (Dave)
- Fourth package status and spare wire frames (Lubomir, Vlad)
- Third package preparation
- Grounding scheme (Vlad)
- Engineering (Bill)
- Electronics (Chris, Nick)
- Gas system (Beni, Bill)
- Pipe outgassing
- Gas mixture (Lubomir)
- Test set-up in 126 (Beni)
- Other