Aug 30, 2011 SiPM Electrical and Cooling
From GlueXWiki
Revision as of 08:15, 24 August 2012 by Elton (Talk | contribs) (→Action Items from previous meetings)
Action Items from previous meetings
- Decide on cable connections for monitoring cable from Bcal wedge to patch panel. Consider electronics needed for pulsing system (Elton and Fernando)
- Get the dosage from the radiation badges on the mini-Bcal during the beam test (Yi)
- Check that the resistor sets on the pre-production boards meet our specifications so that they can be frozen (Jack)
Tentative Agenda
- Announcements
- Action Items
- Schedule, reporting, and manpower (Elton)
- mini-Bcal (Elton)
- SiPM production testing (Yi)
- Mechanical assembly (Jim)
- Temperature compensation (Jack)
- Electronic boards (Fernando and Chris)
- Light guide gluing setup (Scot)
Minutes
Attending: