  • Modifications of config files
- parameters for CAEN R-C adjustment
- parameters for fa125 initialization
- implementation of SYNC events (in progress)
- configuration of TPOL, concurrent running with ST (in progress)
  • Other
- new TS firmware (check in progress)
- BCAL LED trigger distribution through the TS (done)



  • New firmware for F1TDC
- update v3 firmware to the version v3_127
  • CAEN TDC multi-block readout
  • Scalers implementation at SYNC event
- asynchronous pedestals
  • L1 trigger commissioning plans for the fall run
- TAGM calibration (PS trigger)
- FDC alignment (ST/TOF + FCAL)
- FCAL/BCAL triggers (Energy sum)
- Trigger produced by TAGM/TAGH